Mission
Alone We are Strong, Together We are Stronger....
Join the Group - Experience the Difference

Home Daily Rack Membership Ohio Terminals

IGSOA Terminal

CNG Station Design EMV Compliance Contact
Links State Tax Benefits National Terminals Operator A-B-C Private Brand Stage-II decommissioning What's New
Unleaded
Gas Prices
87E10

May_15

1 1.91
2 1.92
3 1.92
4 1.92
5 1.94
6 1.94
7 1.94
8 1.91
9 1.91
10 H
11
12 1.95
13 1.97
14 2.02
15 2.07
16 H
17
18 2.07
19 2.07
20 2.05
21 2.05
22 2.10
23 2.09
24 H
25
26 2.03
27 2.03
28 1.98
29 2.04
30 2.10

  

The U.S. EPA’s ruling on Stage II Decommissioning of Vapor Source Recovery Systems mandates each state produce technical evidence demonstrating that removal will not harm air quality. Legislation varies per state. Source has a comprehensive guide to help navigate the complexities.

Stage II Decommissioning

Source Guides GDFs Through Stage II Decommissioning Requirements,
Cost-Savings

During the ‘90s, in an effort to combat harmful ozone emissions and maintain air quality standards, The United States Clean Air Act mandated gasoline-dispensing facilities adopt Stage II Vapor Recovery systems, and equip automobiles with onboard refueling vapor recovery (ORVR) systems.

Since 2006, all new vehicles have been outfitted with ORVR systems. In 2012, the EPA ruled that such widespread fleet turnover warrants the withdrawal of Stage II Vapor Recovery system requirements for GDFs. As such, GDFs were given the option to remove Stage II Vapor Recovery programs from their state implementation plans (SIPs).

To regulate decommissioning, the EPA requires decommissioning GDFs to produce a technical demonstration showing that removing Stage II Vapor Recovery systems will not adversely impact air quality. Since 2012, the experts at Source have been helping fuel retailers understand their state’s Stage II decommissioning requirements, update their fuel site equipment in a cost-effective and strategic manner, demonstrate environmental compliance and meet critical decommissioning deadlines.

The EPA estimates decommissioning will save the average size GDF $3,000 per year. Contact your Source sales representative today to develop an equipment conversion plan. For a complete state-by-state overview of Stage II decommissioning requirements, including approaching deadlines, visit Source’s Stage II Decommissioning Guide.

 
[Tm_igsoa], [Tm_Petronet] are trademarks of [Ohio Petroleum]. All other products mentioned are registered trademark or trademarks of their respective companies.
Questions or concerns about the web site should be directed to [info@igsoa.net]
Copyright © 2010 [igsoa.net]. All rights reserved.
Last modified: Saturday June 06, 2015.